Q9: What is your usual lead time for molds and parts?

FAQ

Q9: What is your usual lead time for molds and parts?

July 08, 2025

A9: 

1. For Custom Molds:

  Our standard lead time for mold manufacturing typically ranges between 15-25 working days, depending on complexity, size, and material requirements. High-precision or multi-cavity molds may require additional time for quality assurance. Expedited options (30-50% faster) are available for urgent projects, subject to a feasibility assessment.  

2. For Production Parts:

  * Injection-molded parts: 10-15 working days after mold approval (volume-dependent)  

  * CNC machined parts: 5-10 working days (standard), with 3-5 day rush services  

  * 3D printed prototypes: As fast as 24-72 hours for most technologies

3. Key Factors Affecting Lead Time: 

  * Design Complexity: DFM approval may adjust timelines  

  * Material Availability: Specialty alloys/additives may require procurement  

  * Post-processing: Surface treatments (e.g., plating, painting) add 3-7 days  

  * Order Volume: Bulk production scales with quantity (e.g., 50k+ units)  

4. Pro Tip: Share your project specifications (CAD files, material, quantity, and target dates) for a customized timeline with potential optimization options. We consistently achieve 98% on-time delivery** through advanced production scheduling.  

 

 

S'abonner

Continuez à lire, restez informé, abonnez-vous et nous vous invitons à nous dire ce que vous pensez.

Facebook LinkedIn YouTube instagram
CONTACTEZ-NOUS
No. 903, Building A SEC 891 Haicang Dadao Haicang District Xiamen Fujian China 361026

droits d'auteur @2024 Xiamen Boming Industriel & Trading Co., Ltd. Tous droits réservés . RÉSEAU PRIS EN CHARGE

Plan du site / Blog / Xml / politique de confidentialité

laisser un message

laisser un message
Si vous êtes intéressé par nos produits et souhaitez en savoir plus, veuillez laisser un message ici, nous vous répondrons dès que possible.
soumettre

Maison

Produits

WhatsApp

Contactez-nous